Sheet Piles Installation - Interlocking
Monday, December 29th, 2008Ensuring proper and correct interlocking between sheet piles is one of the key and crucial requirement during the installation of sheet piles. Usually this is done manually and can be rather tricky if the the sheet piles need to be interlocked at a height.
Thus this required the hosting of both man and sheet pile high up from the ground to get the job done. And thsi can be dangerous due to the height involved and difficult too as the person esuring the proper interlocking of the sheet piles has to communicate with the crane operator from a height. Further more it will be virtually impossible to do thsi when there is stong cross winds.
Now a company had come out with an igenious solution. A gadget called the “Universal Sheet Pile Threader” solves all the invconvinience and problem as mentioned above. It is completely safe and require only two men ( one infront and the other behind the sheet pile) to install the gadget and done on ground level (thus very safe)
Watch the video below to see how this gadget work.